Mr. Wagara
(1st Deputy Governor-Bank of the Republic of Burundi)
This is to attest that Neomatech Implemented and completed to clients satisfaction the Project for design and Build of the BRB Data Centre and Tape Back, tested, commissioned and handed over to the client on 4/12/2013.The project scope involved Electrical Installation works, FM200 Fire Suppression and detection, Precision Air Conditioning System, 2x 96KW UPS Power system, High Security Doors. Raised Access Floor and IT Structured Cabling installation Works for BRB Sites.
-
Mark O. Mala
(Infrastructure Coordinator-Aga Khan University Hospital Nairobi)
This is to confirm that, Agha Khan University Hospital awarded Neomatech Limited a Tier III data center design and build project in Nairobi through a competitive bidding. The project involved design and build for the Network Critical Physical Infrastructure for data center.
The project involved the following Services:
- Power (Raw & UPS)
- Cooling
- Safety - Fire Detection & Suppression with Early Warning System
- Security CCTV & Access control
- Raised floor
Neomatech clearly understood our requirements and we are happy with their approach, Implementation and project management services. The data center was successfully commissioned in March 2011. We would not hesitate to recommend Neomatech Limited for projects of similar nature.
-
Willis Odhiambo
(Project Manager-CXD Group)
We CXD Group (East Africa Ltd.) worked with Neomatech limited as Project Managers for the Telkom Kenya Tier III Mobile Switch Centre in Westlands, Nairobi in Kenya. CXD Group was the main contractor on this design and build project.
The following installation services were undertaken:
- Raised floor
- Electrical Installations/Cable management,(630kva Voltage Stabilizer)
- 2x630kva Generators and changeover system
- 5400A-Rectifier/2 X 40KA Inverters
- FM200 Fire Suppression System
- Access control
- 3 x 54kw Air Conditioning, 10 x split units, Mechanical Ventilations and HVAC Panel
- Structured Cabling
- Civil Works
Neomatech approach and methodology of design and project management services was excellent and The project was completed in time in December 2008.
We do recommend Neomatech limited for projects of similar nature.
-
Willis Ochieng
(General Manager Alan Dick & Co. Ltd)
We confirm that, Alan Dick & Co. Ltd. assigned Neomatech Limited as Project Managers for a Tier III Mobile Switch Centre Extension for Safaricom Ltd at its QOA Kasarani site in Nairobi, Kenya. Alan Dick & Co. Ltd. was the main contractor for this Project.
The following installation services were involved:
- Raised floor
- Electrical Installations/ Cable management,(630k:va Voltage Stabilizer)
- 2x630kva Generators and changeover system
- 5400A-Rectifier/2 X 40KA Inverters
- FM200 Fire Suppression System
- Access control
- 3 x 54kw Air Conditioning, 10 x split units, Mechanical Ventilations and HVAC Panel
- Structured Cabling
- Civil Works
Neomatech exercised professionalism and team spirit in providing project management services ensuring timely completion. The Mobile Switch Centre was commissioned on 9th September 2009. We would not hesitate to recommend them to you for similar projects.
-
Daniel Mainye
(Country Business Development Manager SevenSeas Technology Ltd.)
Neomatech clearly understood our requirements and we are happy with their approach and methodology of implementation and project management Services. The 4 Floor office Block whose scope for Neomatech included Electrical Installation work, Fire Detection and Raised Access Floor Installation was successfully commissioned in June 2013.We would not hesitate to recommend Neomatech Limited for similar projects.
-
Henry Gathecha
(Group IT Manager-Jubilee Insurance Company Limited)
This is to certify that Neomatech has accomplished the Implementation of the Data Centre Infrastructure and it has been tested and commissioned. The Data Centre is ready to be used by Jubilee Insurance Company. The 12 months warranty period is effective as from 26.06.2012 for all equipment installed by Neomatech that include Raised Floor,FM200 Fire suppression system, Electrical Power Distribution System,2x10Kw Precision Air Condition System, Raised Access Floor, Fire Proof Door and Gypsum partition civil works. We confirm the work has been professionally executed.