Role: Main Contractor, Data Centre Implementation Works
Services offered:
Supply and installation of:
- Electrical power Distribution systems
- 2 X 48KW Scalable UPS
- 60KVA AVR System
- Fire detection and Detection systems
- ACCESS Control
- Lighting installation
- Cable management systems
- Civil works for Partitioning
- Fire proof doors installation
Agha Khan University Data Centre-Nairobi
Role:Main Contractor
Services offered:
- Installation of raised access flooring
- Installation of Lan Cabinet/structured cabling
- Electrical installation systems etc
- Air Conditioning Installation
Tigo Main Data Centre-Kigali Rwanda
Role: Subcontractor under Main Contractor. Services offered:
-Electrical Installation 3 floors
‐Structured cabling 3Floors
‐Equipment Installation
‐ 500 SM Raised access flooring installation
‐Power back up equipment installation
Telkom Kenya Main Data Centre –Nairobi
Role: Electrical and Mechanical and Structured Cabling Sub Contractor undet CXD Group Limited
‐Electrical
‐Mechanical
‐Fire detection and Suppression
‐Structural Engineering‐Raised Computer Flooring
‐Security Sytems
‐Structured cabling
‐Power cabling